How to remove bathroom wall tile yourself: step by step

Old wall tile almost never comes off cleanly. Plan to take the substrate down with it and rebuild — it is faster, cheaper, and the only way the new tile will be flat.

Difficulty 3 of 5 · about half a day · careful

Stop here

Tile, the mastic behind it, and the joint compound at the edges can all contain asbestos in a building from before 1980, and the paint on the surrounding wall can contain lead if it is from before 1978. Do not grind or dry-cut any of it. Test first. Stop and call a specialist if: the tile is set in a thick mortar bed over wire lath (that is a heavy, structural removal, not a pry-bar job); the wall behind the tile is wet, black, or crumbles in your hand; or you find that the tile is holding a plumbing wall together. Assume the drywall behind the tile is being replaced, and budget for it before you start.
See it in your own room — free

Photo of your room, the look you pick, then this guide with the materials counted for your room.

What you need

  • Asbestos sample test (lab mail-in kit)
  • Lead test swabs
  • P100 respirator plus cartridges
  • Heavy-duty contractor bags, 3 mil
  • Replacement backer board / drywall
  • Plastic sheeting and tape for containment
  • Tub or shower pan protection board

Tools

  • Flat pry bar and a wide masonry chisel
  • 3 lb hand sledge
  • Utility knife and a grout saw
  • Drywall saw (cutting the substrate out in panels)
  • Shop vac with a HEPA filter
  • Garden sprayer for misting
  • Reciprocating saw (cutting board out between studs)$35-50/day in LA
  • Safety glasses, face shield, gloves

Step by step

  1. Step 1 of 13

    Work out what the tile is stuck to

    Pull a switch plate or look at a cut edge behind a fixture. Tile over drywall or greenboard comes off with the board. Tile over a thick mortar bed with wire lath is a different, much heavier job — get help for that one.

  2. Step 2 of 13

    Pre-1980: test the tile, grout, and mastic

    Wet a small area, cut a sample, bag it, send it to a lab. Pre-1978 also means lead-testing the painted wall around the field.

  3. Step 3 of 13

    Seal the room

    Plastic across the doorway, tape over the exhaust fan and any register, window fan blowing out, respirator and face shield on.

  4. Step 4 of 13

    Protect the tub, the pan, and the drain

    Cardboard plus a moving blanket in the tub, taped down, and a rag stuffed in the drain so chips cannot go down it.

  5. Step 5 of 13

    Confirm water and power to the room are off

    The shower valve, the vanity light, and any outlet in the field are all things you can hit.

  6. Step 6 of 13

    Open a starting point at the top of the field

    Mist the area. Break one tile with the hand sledge and chisel, then work the chisel behind the neighboring tiles at a low angle. Always work downward so falling tile is below your hands.

  7. Step 7 of 13

    Cut the substrate out with the tile still attached

    Score the drywall along the studs above and beside the field, then pull whole panels — tile and board together. This is faster than chasing mastic and gives you a flat wall to build back.

  8. Step 8 of 13

    Cut carefully around plumbing

    Set the recip saw blade shallow, or use a hand saw within a foot of the valve, the tub spout, or any cable. Expose before you cut.

  9. Step 9 of 13

    Look into the open wall before you close anything

    Wet framing, black staining, crumbling board, or a dripping valve means stop and fix the cause. Photograph what you find.

  10. Step 10 of 13

    Check the studs for plumb and the cavity for blocking

    New tile needs a flat plane. Note any stud that bows out — the hanging task shims or planes it before board goes back on.

  11. Step 11 of 13

    Bag half full, double-bagged, and haul it out

    Tile and mortar are dense. Small loads down a protected path.

  12. Step 12 of 13

    HEPA-vacuum the cavity, the floor, and the framing

    Then wipe the framing down damp. Dust left in the cavity comes back out for months.

  13. Step 13 of 13

    Ready to hang new board

    The hanging task picks up from here with the right board for a wet area.

    Quality check

    • All tile and its substrate are out; no loose mastic left on framing
    • Pre-1980 materials were lab-tested before they were disturbed
    • Tub or pan is undamaged and the drain is still plugged
    • No wet framing, mold, or dripping valve in the open cavity
    • Studs checked for plumb and flat; bows noted
    • Room HEPA-vacuumed and framing wiped damp

Common mistakes

  • Grinding or dry-cutting old tile and grout. This is the fastest way to fill an apartment with asbestos and silica dust. Test first, mist everything, and break tile with a chisel rather than a grinder. Mistake #1 in this task.
  • Trying to save the drywall behind the tile. You will spend a full day chasing mastic and end up with a wall too uneven to tile. Cut the substrate out in panels between the studs and start clean.
  • Working over an unprotected tub. One falling tile chips the glaze permanently. Cover the tub and the pan with board before the first swing.
  • Running a recip saw blind through a wall. Supply lines, the shower valve, drain lines, and cables live in that wall. Set the blade depth and cut only what you can see.
  • Rebuilding over a wet or black wall cavity. If it is wet there is a leak, and the new tile will fail the same way. Find the source before you close it up.
  • Skipping the containment. Bathroom demo dust finds the whole unit through the door and the exhaust fan. Seal the door and tape the fan.

Draft guide written from standard practice, not yet reviewed by a licensed pro. Follow product labels where they differ.