Renovation guides

How to check a subfloor before new flooring yourself: step by step

Short answer

To check a subfloor before new flooring, follow the 12 steps below, from “Strip the room down to bare subfloor” to “Re-check with the straightedge and decide what is next”. Difficulty 2 of 5; for a first-timer, plan on about half a day. Read the “Stop here” box below before step 1.

Quick review by a licensed contractor on Oct 7, 2026. This is not a certification. Follow product labels where they differ.

Half a day that decides whether your new floor lasts. Most plank floors allow about 3/16" in 10 ft (1/8" in 6 ft), tile under 15" about 1/4" in 10 ft, and large-format tile only 1/8" in 10 ft. Your flooring's install guide is the number that counts.

Difficulty 2 of 5 · about half a day · careful

Stop here

A floor that is less flat than your flooring's install guide allows must be leveled before any floor goes down — most plank floors allow about 3/16" in 10 ft (1/8" in 6 ft), tile under 15" about 1/4" in 10 ft, and large-format tile 1/8" in 10 ft; no underlayment makes up for it. Standing water or heavy condensation under a taped plastic sheet on concrete means stop: the slab is wet and needs a specialist before anything covers it. A dry sheet is only a screen — if your flooring's instructions ask for a calcium chloride or RH test, that number decides. A subfloor that is soft, spongy, or stained from a past leak is a replacement, not a DIY fix. And if the building is from before 1980, do not sand, grind, or break old vinyl, tile, or the black adhesive under it — that is possible asbestos; have it tested first.
See it in your own room — free

Photo of your room, the look you pick, then this guide with the materials counted for your room.

What you need

  • Clear plastic sheeting for the moisture test, 2 ft x 2 ft pieces
  • Duct or house-wrap tape (seals the moisture test)
  • Subfloor screws, 2 1/2"
  • Floor patch / repair compound
  • Chalk or a lumber crayon (marking the low spots)

Tools

  • 6 ft straightedge or long level — the one tool this task is about
  • Bright flashlight or work light (you read the gap by the light under the straightedge)
  • Tape measure and a set of coins or feeler gauges to measure the gap
  • Shop vacuum
  • Pry bar and a scraper (lifting old flooring and staples)
  • Drill/driver (screwing down squeaks)
  • Moisture meter for wood subfloors — $20–30/day. For a wood subfloor, compare the reading with your flooring's instructions. On concrete the plastic-sheet test is the free first screen.
  • Angle grinder with a cup wheel and a dust shroud, plus a HEPA vacuum (only for high spots on concrete) — Rent them together. Never grind concrete without the shroud hooked to the vacuum.
  • Fitted N95 or better respirator (grinding concrete makes silica dust)

Step by step

  1. Step 1 of 12

    Strip the room down to bare subfloor

    Strip the room down to bare subfloor

    Pull the carpet and pad, the tack strip, staples, and any loose flooring. One layer of old glued-down vinyl can stay under a floating plank floor if it is stuck tight everywhere and your flooring's instructions allow it — just do not sand it. Tile and glue-down floors need it removed or covered per their instructions.

  2. Step 2 of 12

    Vacuum until the floor is clean

    Vacuum until the floor is clean

    Sweep first, then vacuum the whole floor including the perimeter and corners. A single pebble under a straightedge gives you a false reading, and later it is a click underfoot forever.

  3. Step 3 of 12

    Identify what you are standing on

    Identify what you are standing on

    Plywood or OSB over joists, or a concrete slab? Tap with a knuckle: hollow and slightly springy is wood, dead solid is concrete. The moisture test and the leveling products differ for each.

  4. Step 4 of 12

    Lay the 6 ft straightedge and read the light

    Lay the 6 ft straightedge and read the light

    Set the straightedge flat on the floor and look at the gap underneath with a flashlight behind it. If light shows through, slide a coin or feeler gauge in and write the gap down. Compare it with your flooring's install guide: for most plank floors, more than 1/8" (3 mm) under a 6 ft straightedge is out of tolerance. Large-format tile is tighter, about 1/8" in 10 ft — check it with a 10 ft straightedge or a tight string line.

  5. Step 5 of 12

    Walk the straightedge across the whole room

    Walk the straightedge across the whole room

    Move it in a grid — five or six positions lengthwise, the same crosswise, then two diagonals, and one straight through each doorway. Overlap each position by about half the straightedge so nothing is missed.

  6. Step 6 of 12

    Circle and label every out-of-tolerance spot

    Circle and label every out-of-tolerance spot

    Draw a chalk circle around each low or high spot and write the measured gap inside it. Write down the single worst number in the room — that is what decides whether you patch, grind, or pour self-leveler.

  7. Step 7 of 12

    Concrete: tape down the plastic-sheet test

    Concrete: tape down the plastic-sheet test

    Tape a 2 ft x 2 ft square of clear plastic flat to the bare slab and seal all four edges so no air gets in. Put one square in the middle of the room and one near an exterior or below-grade wall.

  8. Step 8 of 12

    Leave it 24 hours, then read it

    Leave it 24 hours, then read it

    Pull the tape and look. Dry plastic and a dry slab is a good sign, not a pass: many flooring instructions require a calcium chloride or in-slab RH test with a number, and a 6 mil plastic vapor barrier over concrete even when the slab tests dry. Condensation on the underside, a dark patch on the concrete, or standing water means stop — get a specialist to test and seal the slab before anything covers it.

  9. Step 9 of 12

    Wood subfloor: hunt the squeaks and screw them down

    Wood subfloor: hunt the squeaks and screw them down

    Walk the whole floor slowly in stocking feet, shifting your weight, and mark every noise. Find the joist under each mark and drive a 2 1/2" subfloor screw through the plywood into it, a couple of inches from the existing nail. Keep screws on the joist line, and use a length that goes through the subfloor plus about 1-1/4" into the joist, no more — pipes and wires run between and under the joists.

  10. Step 10 of 12

    Look for soft spots, stains, and movement

    Look for soft spots, stains, and movement

    Press hard with your heel near every wall, under every window, and around the toilet and dishwasher. Spongy plywood, a dark stain, or a musty smell means water — stop and find the source before you go any further.

  11. Step 11 of 12

    Patch the small dips and knock down the small humps

    Patch the small dips and knock down the small humps

    Trowel floor patch into gouges, seams, and dips smaller than a dinner plate and let it dry per the label. Grind small high spots on concrete only with a grinder whose dust shroud is hooked to a HEPA vacuum, wearing a fitted N95 or better — grinding concrete makes silica dust, so never dry-grind without dust collection. And only if the slab has no old vinyl or glue on it.

  12. Step 12 of 12

    Re-check with the straightedge and decide what is next

    Re-check with the straightedge and decide what is next

    Go over every spot you patched. If nothing exceeds your flooring's flatness spec you can go straight to the floor; if anything still does, the next task is self-leveling underlayment.

    Quality check

    • The straightedge was run lengthwise, crosswise, diagonally, and through every doorway
    • No gap exceeds your flooring's flatness spec (1/8" over 6 ft for most plank, tighter for large tile), or the spot is written down for leveling
    • On concrete: the 24-hour plastic-sheet test came back dry, and any calcium chloride or RH test your flooring requires is done
    • No squeaks left when you walk the room
    • No soft, spongy, or stained areas
    • Floor is vacuumed clean and patches are dry

Common mistakes

  • Judging flatness by eye or with a 2 ft level. A floor can look perfect and still roll 1/4" over six feet, which is what breaks click-lock joints. Only a 6 ft straightedge tells you. This is mistake #1 in this task.
  • Skipping the moisture test on a slab. Concrete on grade can push moisture up for years. Flooring goes down, the moisture has nowhere to escape, and you get cupping, mold, and a failed warranty. The plastic sheet costs a piece of plastic and one day, and it is only a screen — many flooring warranties also want a calcium chloride or RH test with a number.
  • Checking in one direction only. A floor that reads flat along the room can roll badly across it. Check lengthwise, crosswise, and diagonally, and always check right across every doorway.
  • Sanding or grinding old vinyl or the black glue under it. In a building from before 1980 that material and its adhesive can contain asbestos, and sanding it puts fibers in the air through the whole apartment. Do not sand, grind, or smash it — test first.
  • Pouring leveler over a squeak. The squeak is the subfloor moving against a joist or a nail. Leveler adds weight, not fastening, and the noise comes back through your new floor. Screw it down first.
  • Covering a soft or stained spot. Spongy plywood or a water stain means an old or active leak. Putting a new floor over it hides the problem until it is a much larger repair. Find the source before you go further.
Get this job planned for your room

Questions

How long does it take to check a subfloor before new flooring?

Difficulty 2 of 5. For a first-timer, plan on about half a day.

What do I need to check a subfloor before new flooring?

Clear plastic sheeting for the moisture test, 2 ft x 2 ft pieces, Duct or house-wrap tape (seals the moisture test), Subfloor screws, 2 1/2", Floor patch / repair compound, Chalk or a lumber crayon (marking the low spots). Tools: 6 ft straightedge or long level — the one tool this task is about, Bright flashlight or work light (you read the gap by the light under the straightedge), Tape measure and a set of coins or feeler gauges to measure the gap, Shop vacuum, Pry bar and a scraper (lifting old flooring and staples), Drill/driver (screwing down squeaks).

What are the most common mistakes when you check a subfloor before new flooring?

Judging flatness by eye or with a 2 ft level. A floor can look perfect and still roll 1/4" over six feet, which is what breaks click-lock joints. Only a 6 ft straightedge tells you. This is mistake #1 in this task. Skipping the moisture test on a slab. Concrete on grade can push moisture up for years. Flooring goes down, the moisture has nowhere to escape, and you get cupping, mold, and a failed warranty. The plastic sheet costs a piece of plastic and one day, and it is only a screen — many flooring warranties also want a calcium chloride or RH test with a number. Checking in one direction only. A floor that reads flat along the room can roll badly across it. Check lengthwise, crosswise, and diagonally, and always check right across every doorway.

When should I stop and call a pro?

A floor that is less flat than your flooring's install guide allows must be leveled before any floor goes down — most plank floors allow about 3/16" in 10 ft (1/8" in 6 ft), tile under 15" about 1/4" in 10 ft, and large-format tile 1/8" in 10 ft; no underlayment makes up for it. Standing water or heavy condensation under a taped plastic sheet on concrete means stop: the slab is wet and needs a specialist before anything covers it. A dry sheet is only a screen — if your flooring's instructions ask for a calcium chloride or RH test, that number decides. A subfloor that is soft, spongy, or stained from a past leak is a replacement, not a DIY fix. And if the building is from before 1980, do not sand, grind, or break old vinyl, tile, or the black adhesive under it — that is possible asbestos; have it tested first.